University at 1st Avenue Storm Outfall

Project Location: Denver, Colorado
Date Completed: March 2014
Methodology: Hand Tunnel

 

For this project, UIT installed 140 LF of 81-inch Hobas Pipe using the hand tunnel method. Public awareness was a factor in this project because it was located at the single busiest intersection in the Cherry Creek area. This project was named a 2015 Colorado Chapter, American Public Works Association Award (APWA) project winner.